Builder: Baulderstone
Design and Construct Mechanical Services Contractor: Climatech ACT

The Lena Karmel Lodge (also known as SA4) development included under ceiling air conditioning to 614 student apartments via a 2 pipe CHW/HHW system. In addition a central dry cooler based CW plant was provided to serve ground floor retail spaces with water cooled package units while the CHW/HHW plant served various communal spaces on the student levels. Ventilation was provided via local apartment exhaust systems and central kitchen exhaust systems for the ground tenancies. On this project Michael completed detailed drafting and as-built drawings in addition to his engineering duties for Climatech.

Unilodge – Lena Karmel Lodge
ANU on the Lena Karmel Lodge
Architecture and Design reporting on Lena Karmel Lodge winning the 2013 BPN Multi-density Residential Award
Nettleton Tribe, the architects on the Lena Karmel Lodge
Woroni reporting on the opening of the Lena Karmel Lodge
Riot Act reporting on the opening of the Lena Karmel Lodge
Andrew Leigh MP on the Lena Karmel Lodge
Greensense, who provided energy dashboards on Lena Karmel Lodge
Defire, who provided fire engineering solutions for Lena Karmel Lodge